Zone & entitlement mapping
We classify your exact site and compute the specific IPS, interest, duty and SGST benefits it qualifies for — before you commit.
CA-led advisory on Maharashtra’s Package Scheme of Incentives — industrial promotion subsidy, interest subsidy, electricity-duty and stamp-duty exemption and SGST-linked benefits for new and expanding units. We map your entitlement by location, file the incentive application, and structure the term loan to fit. Pune & Mumbai-based, CA-led since 2011.
The Package Scheme of Incentives (PSI) is Maharashtra’s industrial-incentive framework to attract manufacturing investment, especially into less-developed regions. Depending on the scheme in force and the site’s taluka classification, it can offer an Industrial Promotion Subsidy (a percentage of eligible fixed-capital investment), interest subsidy, exemption from electricity duty and stamp duty, and SGST-linked incentives. Developed belts get little or none; Groups C, D, D+, No-Industry, Aspirational and Naxal-affected areas get the most — the scheme is designed to pull investment beyond Mumbai and Pune.
Finnova Advisory is an advisory firm — we assess eligibility, structure the loan and prepare the incentive application; the incentives are sanctioned by the Government of Maharashtra under the scheme in force (the PSI 2019 and its successor industrial policy). Quantum, zones and eligibility are updated periodically and confirmed case by case.
PSI is a package, not a single grant. Here are the levers, and the reminder that quantum rises sharply the further your site is from the developed Mumbai–Pune belt.
| Incentive | What it is | Where / who |
|---|---|---|
| IncentiveIndustrial Promotion Subsidy | What it isA % of eligible fixed-capital investment | Where / whoHigher in less-developed talukas; MSME/Large/Mega bands |
| IncentiveInterest subsidy | What it isSubsidy on term-loan interest | Where / whoFor eligible new & expansion units, per scheme |
| IncentiveElectricity duty exemption | What it isExemption for the eligibility period | Where / whoGroups C/D/D+, No-Industry, Aspirational, Naxal areas |
| IncentiveStamp duty | What it isExemption / refund on project docs | Where / whoOn eligible instruments, per location & scheme |
| IncentiveSGST-linked incentive | What it isIncentive linked to SGST paid | Where / whoStructure and cap set by the scheme in force |
Indicative — the exact benefits, percentages, ceilings and eligibility period depend on the taluka classification, the unit’s size (MSME / Large / Mega) and the PSI version in force. We compute your specific entitlement before you commit a rupee.
PSI rewards fixed-capital investment in manufacturing. The benefit depends on what you’re building and, above all, where.
Greenfield plants investing in land, building, plant and machinery — the core beneficiary, with benefit scaled to the zone and size.
Existing units adding capacity beyond a threshold of their gross fixed assets — eligible for incentives on the expansion investment.
Units adding new products or upgrading technology and machinery, where the scheme in force recognises the investment.
Sectors the state prioritises from time to time — often with enhanced or special incentive packages beyond the base bands.
The single biggest driver of benefit — a unit in a C, D, D+, No-Industry, Aspirational or Naxal-affected taluka captures far more than one in the developed belt.
PSI benefits are lost more often to a mis-classified site, a late application or an unbankable loan than to genuine ineligibility. We close those gaps.
We classify your exact site and compute the specific IPS, interest, duty and SGST benefits it qualifies for — before you commit.
The incentive application to the Directorate of Industries / DIC, prepared to specification and filed within the eligibility window.
The project term loan built so the interest subsidy and investment benefits line up — and so the loan actually gets sanctioned.
PSI mapped alongside central benefits like AIF and CGTMSE — the full picture, so you capture every rupee the rules allow.
Many benefits hinge on applying before commencement or within a window — we sequence the project so eligibility isn’t forfeited.
From site classification to a sanctioned loan and a filed incentive claim — sequenced so no benefit is lost to timing.
We classify the taluka and unit type and compute the specific PSI entitlement under the scheme in force.
A bankable DPR, projections and the term-loan file — built to clear a credit committee and to line up with the incentives.
The PSI application prepared and filed with the Directorate of Industries / DIC within the eligibility window.
The term loan placed and negotiated to sanction, with the interest-subsidy structure built into the facility.
Drawdown, the Eligibility Certificate and ongoing incentive claims managed through the eligibility period.
Four reasons the incentive and the loan both land — instead of one falling through.
We run the term loan and the PSI application as one mandate — so the interest subsidy fits the facility and neither is left behind.
Pune- and Mumbai-based, working with the state’s manufacturers every week — we know the classification and the process.
We sequence applications and commencement so the eligibility window is never accidentally forfeited.
State PSI mapped against central schemes like AIF and CGTMSE — the complete, honest picture of what your project can claim.
One conversation tells you which PSI benefits your site and unit qualify for, roughly how much they’re worth, and how to structure the loan and application to capture them. No pitch — just a straight read.
We’ve received your details. A senior member of our team will review them and get back to you within one business day. Everything you’ve shared stays strictly confidential.
Finnova Assistant
Ask about our services